HIPAA uses both terms, and they point at two different jobs. Risk analysis is the Security Rule's standing duty to assess risks to all the electronic PHI an organization holds1. Risk assessment is the name NIST and HHS give to the process of doing that work34. It is also the name of a separate four-factor test in the Breach Notification Rule, used after a specific incident2. Most organizations need both documents.
What the regulation calls each one
The Security Rule's heading is "Risk analysis"1. The sentence under that heading then uses the other word: "Conduct an accurate and thorough assessment of the potential risks and vulnerabilities" to ePHI1. So the rule itself treats an analysis as something made by assessing.
The Breach Notification Rule uses "risk assessment" and nothing else. An impermissible use or disclosure of PHI is presumed to be a breach unless the organization demonstrates a low probability of compromise "based on a risk assessment of at least the following factors"2.
That gives two documents with similar names:
| Security Rule risk analysis | Breach risk assessment | |
|---|---|---|
| Where it is | 45 CFR 164.308(a)(1)1 | 45 CFR 164.4022 |
| When | Standing duty, kept current | After a specific impermissible use or disclosure |
| What it covers | All the ePHI the organization holds1 | The PHI involved in that one incident2 |
| The question | What could go wrong, how likely is it, and how bad would it be? | Is there a low probability that this PHI was compromised? |
| What it looks at | Threats, vulnerabilities, likelihood, impact3 | Four factors: the PHI involved, who received it, whether it was actually acquired or viewed, and mitigation2 |
| What comes out | A list of risks with a level for each, feeding risk management13 | A decision to notify or not, with the reasons |
| Form of PHI | Electronic only1 | Any form, including paper2 |
How NIST separates the two words
NIST's guide to the Security Rule addresses the wording in a footnote. Risk analysis "refers to that which is required by the Security Rule", and risk assessment "refers to the process by which a regulated entity can determine the level of risk to ePHI"3. On that reading, the analysis is the legal duty and the assessment is how the duty gets done.
NIST then uses "risk assessment" for the rest of the chapter. Its method has seven steps, from preparing for the assessment through to documenting the results3. NIST adds that HHS OCR "does not prescribe any particular risk assessment or risk management methodology"3.
HHS's own materials lean the same way. HealthIT.gov says the Security Rule requires covered entities and business associates "conduct a risk assessment of their healthcare organization", and the free download is named the Security Risk Assessment Tool4.
We think the argument over the two names is the least useful part of this topic. A consultant's "security risk assessment" and the rule's "risk analysis" are the same deliverable if the work covers what 164.308 asks for1. The distinction that changes what a practice has to do is the one in the table: the standing analysis of everything, against the incident assessment of one event.
Where risk management and evaluation fit
Two neighbours of the risk analysis add to the confusion.
Risk management is the next paragraph in the rule. It requires security measures "sufficient to reduce risks and vulnerabilities to a reasonable and appropriate level"1. NIST puts the relationship plainly: the results of the risk assessment are used to make risk management decisions3.
Evaluation is a separate standard in the same section. It calls for a "periodic technical and nontechnical evaluation" of how well the organization's security policies and procedures meet the rule, repeated when operations or the environment change1. An evaluation checks the safeguards against the rule. A risk analysis looks at threats to the data. A practice that has only walked through a checklist of safeguards has done something closer to the first.
The breach risk assessment is not a smaller risk analysis
The second document has a different trigger and a different burden.
It starts from a presumption. Any acquisition, access, use or disclosure of PHI not permitted by the Privacy Rule "is presumed to be a breach"2. The organization can rebut that only by demonstrating a low probability of compromise through the four factors2. If it cannot, notification follows, with individual notices due no later than 60 calendar days after discovery2.
The proof sits with the organization. The rule gives the covered entity or business associate "the burden of demonstrating" that notifications were made or that the incident was not a breach2. HHS said in its 2013 rulemaking that this kind of assessment should not be a new exercise for organizations that already assess security incidents7.
A good standing risk analysis makes the incident assessment faster. If the organization already knows what a given folder or mailbox held, the first factor is half answered before the incident. The breach notification page covers the factors and deadlines.
How long each one is kept
Both are records the rules expect to exist. The Security Rule's documentation standard requires a written record of any action, activity or assessment that has to be documented, retained for 6 years from its creation or from when it was last in effect, whichever is later5. The Breach Notification Rule applies the Privacy Rule's documentation requirement to breach matters, and that requirement sets a retention period of six years26.
Which do you need?
Both, but not on the same day.
Every covered entity and business associate needs the Security Rule risk analysis, whatever name is on the cover1. NIST says to treat it as an ongoing activity and update it on a periodic basis3. The breach risk assessment is written when something goes wrong and the organization wants to show that notification is not required2.
The two share a data question. The standing analysis asks where ePHI is. NIST's first step is to understand where ePHI is created, received, maintained, processed and transmitted3. The incident assessment asks what was in the files that got out, since its first factor is "the nature and extent of the protected health information involved, including the types of identifiers"2.
A file scan helps with that question in both cases. VellumSoft scans PST and email exports, documents and images for US and Canadian PII and PHI on the local machine. Its typical uses include both, before an audit or assessment and when scoping an incident. A scan does not rate risk or decide whether an event is a breach. Version 2.0.2 does not read Word (DOCX), Excel (XLSX), ZIP or 7z files, and no scanner finds everything.
For the standing analysis, see finding ePHI for a HIPAA risk analysis and the risk assessment template. The how it works page shows what a scan involves. Related posts: is Microsoft 365 HIPAA compliant?, how to find PII on your network, SSNs in plain text and finding SSNs with PowerShell.
If a document is titled "risk assessment", open it and check which of the two it is. The title will not say.
This post explains the law in general terms and is not legal advice.
Questions
Is a HIPAA risk analysis the same as a risk assessment?
For the Security Rule duty, people use the two names for the same piece of work. NIST draws a fine line: risk analysis is what the rule requires, and risk assessment is the process used to work out the level of risk. A separate risk assessment exists in the Breach Notification Rule, and that one is a different document.
Which one does HIPAA require?
Both, at different times. The Security Rule requires a risk analysis of all the ePHI an organization holds. The Breach Notification Rule requires a risk assessment of at least four factors when an organization wants to show that an impermissible use or disclosure was not a reportable breach.
What is the difference between risk analysis and risk management under HIPAA?
They are consecutive paragraphs in the same section. Risk analysis identifies and assesses risks and vulnerabilities to ePHI. Risk management is implementing security measures sufficient to reduce those risks to a reasonable and appropriate level. One produces a list and the other acts on it.
Why is the HHS tool called a risk assessment tool if the rule says risk analysis?
HHS and ONC use the everyday name. HealthIT.gov describes the Security Rule as requiring covered entities and business associates to conduct a risk assessment, and calls its download the Security Risk Assessment Tool. The regulation's own heading for the same duty is risk analysis.
Sources
- eCFR, 45 CFR 164.308, Administrative safeguardsReviewed 16 Nov 2026
- HealthIT.gov (ONC), Security Risk Assessment ToolReviewed 16 Nov 2026
- eCFR, 45 CFR 164.316, Policies and procedures and documentation requirementsReviewed 16 Nov 2026